Tennis courts require a precise surface slope, typically 1 percent cross-slope, to drain without pooling. Loudoun County’s clay soil makes achieving that slope without proper grading and aggregate base difficult. The on-site evaluation measures existing grade, identifies low spots, and confirms how much excavation and fill work the site needs before the estimate is written.
The itemised estimate covers site grading, sub-base compaction, concrete or asphalt slab, acrylic color coat, and ITF-specification line marking as separate line items. Net post sleeves and fencing are included in the same scope when specified during the evaluation, keeping the entire project coordinated under one written estimate with no scope gaps.
Acrylic color coating is applied in multiple passes with manufacturer-specified cure intervals between coats. The final walkthrough checks surface slope with a level, verifies baseline and service box dimensions against ITF specs, and confirms fencing post plumb and gate operation before the project is signed off.